I was looking into the new, probably AI, data center being built in town and noticed it’s built by a private equity backed firm. The data center was rejected by the city and has to operate with a standard cooperate building water supply. They said are switching to air cooling only and reducing the compute power to keep power usage the same. This has caused amazon, the alleged operator, to back out. So they are building a giant reduced capacity data center with no operator and apparently still think that’s a good idea. My understanding of the private equity bubble is that the firms can hide “under performing” assets because it’s all private. From what I read, possibly 3.2 Trillion dollars of it. I feel like this new data center is going on the “under performing” pile.

  • gravitas_deficiency@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 day ago

    MTBF is absolutely not six years if you’re running your H100 nodes at peak load and heat soaking the shit out of them. ML workloads are particularly hard on GPU RAM in particular, and sustained heat load on that particular component type on the board is known to degrade performance and integrity.

    As to Meta’s (or MS, or OpenAI, or what have you) doc on MTBF: I don’t really trust them on that, because they’re a big player in the “AI” bubble, so of course they’d want to give the impression that the hardware they’re using in their data centers still have a bunch of useful life left. That’s a direct impact to their balance sheet. If they can misrepresent extremely expensive components that they have a shitload of as still being worth a lot, instead of being essentially being salvage/parts only, I would absolutely expect them to do that. Especially in the regulatory environment in which we now exist.