Usually fiber lines that have either been there for decades or the the federal government has been effectively paying them to install for decades decades and they just fucking didn’t do it yet.
Lots of those “government surcharges” that aren’t quoted in their estimates and show up as a surprise bill were authorized by the government, but go directly to the carriers and are supposed to be used to cover the cost of infrastructure upgrades and extension.
I’ve also been involved in something similar. It costs a lot to expand infrastructure. Part of my job would be to plan and explain the costs associated with that. Wireless still needs a wired connection, and wireless still has connection limitations. You can’t just add more users and expect things to work. And you can’t just plop another receiver without it interfering with the others. It needs to be properly planned and something as simple as a building’s signal reflectivity can mess an entire project up. More towers, more equipment, more redundancy, more personnel, more cables, more power, and forking all the money to do all this within the time limit or face fines is a huge task. And that’s assuming it could even work on a technical level, sometimes you just can’t do things (don’t want to interfere with FAA requirements and such) and people don’t understand.
I hate ATT too, but from a purely financial and planning point of view, I’ve been there. You can’t just snap some fingers and make things happen just like that.
They aren’t laying lines though. It’s the Internet Air program which provides it through 5g.
And where’s does 5g come from
Usually fiber lines that have either been there for decades or the the federal government has been effectively paying them to install for decades decades and they just fucking didn’t do it yet.
Lots of those “government surcharges” that aren’t quoted in their estimates and show up as a surprise bill were authorized by the government, but go directly to the carriers and are supposed to be used to cover the cost of infrastructure upgrades and extension.
I’ve also been involved in something similar. It costs a lot to expand infrastructure. Part of my job would be to plan and explain the costs associated with that. Wireless still needs a wired connection, and wireless still has connection limitations. You can’t just add more users and expect things to work. And you can’t just plop another receiver without it interfering with the others. It needs to be properly planned and something as simple as a building’s signal reflectivity can mess an entire project up. More towers, more equipment, more redundancy, more personnel, more cables, more power, and forking all the money to do all this within the time limit or face fines is a huge task. And that’s assuming it could even work on a technical level, sometimes you just can’t do things (don’t want to interfere with FAA requirements and such) and people don’t understand.
I hate ATT too, but from a purely financial and planning point of view, I’ve been there. You can’t just snap some fingers and make things happen just like that.