• Beacon@fedia.io
      link
      fedilink
      arrow-up
      4
      ·
      18 days ago

      Dude not even close! The 2nd ave subway project added 3 new stops. The IBX is adding WAY more than that. And even if you wanna count the entire hypothetical second avenue line as a single project (which it obviously isn’t because each “phase” of the entension is being done multiple decades apart at best), then the hypothetical entire line is still way less than the IBX.

      • DrunkEngineer@lemmy.world
        link
        fedilink
        English
        arrow-up
        2
        ·
        18 days ago

        Just those 3 new stops have double the ridership of the entire IBX. When SAS phase 2 is added, the difference will be more like 5x.

    • A7thStone@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      17 days ago

      Found the Manhattanite. You guys hate to admit anything important exists outside of Manhattan.